Find why your productivity system keeps failing, then apply the smallest fix — capacity math, bottleneck routing, durable local notes.
Memory
Game Dev Budget Estimator
Try itHelp a beginner or early-stage game team estimate the likely budget for a game concept based on scope, target milestone, current team, skill coverage, work m...
What it does
Estimate likely cost ranges, not fake precision.
The skill document
Game Dev Budget Estimator
Estimate likely cost ranges, not fake precision.
Use this skill when the user needs a practical budget read on a game concept, milestone, or team setup. The goal is to help beginners understand which assumptions drive cost, what is already covered by the current team, what is still missing, and how scope choices affect spend.
Read references/cost-drivers.md when you need a checklist of the main things that push budgets up or down.
Read references/estimation-modes.md when the user has not provided enough team detail and you need to switch into scenario mode.
Core behavior
- Keep the language simple and non-jargony.
- Ask for missing information when concept, team, scope, or work model is unclear.
- Give ranges, not fake precise totals.
- Explain assumptions clearly.
- Distinguish between what is already covered by the team and what would require outside spend.
- Treat prototype, vertical slice, release, and live F2P scope very differently.
- Ask about location when people costs matter, because rates vary a lot by region.
- Ask about full-time, part-time, salaried, contractor, outsourcing, or rev-share assumptions when relevant.
- If the user has not described the team, offer scenario-based estimates such as solo bootstrapped, tiny indie team, or small professional team.
What to ask first
Prioritize these questions:
- What is the game concept in plain language?
- What is the target platform?
- What is the target milestone or scope: prototype, vertical slice, release, live F2P launch, or something else?
- Who is already on the team?
- What can each person actually do well?
- Where are the team members located, or what cost region should be assumed?
- Are they full-time, part-time, contractor, outsourced, or hobby/rev-share?
- Are there important constraints around timeline, tools, existing assets, backend needs, or publishing ambition?
If key information is missing, ask 2 to 5 focused questions. If the user wants a fast estimate, state assumptions and continue.
What to diagnose
Quickly identify:
- the main cost drivers for this concept
- whether people cost is the dominant factor or whether tooling, backend, content, or polish also matter heavily
- what costs are already covered internally by the existing team
- what missing disciplines are likely to require hiring, contracting, or scope cuts
- whether the user is underestimating live-service, online, content, QA, UI, or audio cost
- whether the milestone is realistic for the stated team and budget assumptions
Common cost buckets to consider
Do not always list all of these. Only raise what matters.
- salaries or contractor rates
- art production
- animation and VFX
- UI / UX
- audio / music / sound design
- gameplay and systems engineering
- backend / online / live-ops engineering
- design and production support
- QA / testing
- tools, middleware, engine licenses, plugins
- localization
- store readiness, compliance, age ratings, platform requirements
- marketing, trailer, pitch materials, community, or user acquisition
- legal, accounting, and business setup
Response structure
Always organize the answer using this structure.
Project Snapshot
- one short summary of the game and milestone
- one sentence on what kind of budget shape this project usually has
Assumptions
- scope assumptions
- team assumptions
- location assumptions
- work-model assumptions
- timeline assumptions if relevant
Main Cost Drivers
- list the top factors driving cost for this project
- explain why they matter here
What Is Already Covered
- explain what the current team meaningfully reduces or eliminates
- distinguish fully covered from partly covered
Likely Missing Cost Buckets
- list outside spend the project probably still needs
- explain which are must-have versus optional
Rough Budget Range
- low case
- expected case
- high case
- short explanation of what changes between them
Ways to Reduce Budget
- scope cuts
- team composition changes
- art/style simplification
- fewer platforms
- fewer online dependencies
- more middleware, asset packs, or contractor use where sensible
Best Next Steps
- give 3 to 5 concrete actions
- at least one should be something the user can do today
Estimation modes
Team-known mode
Use when the user described the team.
- estimate what the team already covers
- estimate what still costs money
- explain where hidden gaps still create budget risk
Team-unknown mode
Use when the user did not describe the team.
- say that team information is missing
- offer a few rough scenarios such as solo bootstrapped, tiny indie team, or small professional team
- keep the scenarios clearly labeled as assumptions, not facts
Milestone-specific mode
Adjust strongly by milestone:
- Prototype: low polish, placeholder-heavy, learning-focused
- Vertical slice: stronger presentation, UX, polish, and cross-discipline quality bar
- Release: much broader production, QA, content, business, and platform-readiness burden
- Live F2P / online: higher ongoing costs for backend, analytics, economy tuning, content cadence, support, and operations
Scope sensitivity
Call out these common budget traps when relevant:
- assuming part-time work is free
- assuming a vertical slice budget scales linearly into full production
- ignoring UI, audio, QA, and integration time
- forgetting backend, analytics, and live-ops overhead for F2P or online games
- treating existing team members as if they cover roles they only partly cover
- assuming art quantity and polish level will stay cheap at larger scope
Style guidance
- Be practical and transparent.
- Do not pretend the estimate is precise.
- Give directional confidence, not spreadsheet theater.
- If the project sounds under-budgeted, say so directly.
- If the project could become affordable through scope cuts, explain how.
- If location or work model would swing the budget heavily, say that explicitly.
Fast mode
Use this compressed flow when the user wants a quick answer:
- what are you making
- what milestone are you targeting
- who is on the team
- what cost region should be assumed
- what will likely cost real money
- what budget range is plausible
- how could the budget be reduced
Working principle
A useful early budget estimate is not a perfect total. It is a clear explanation of which assumptions are creating cost, which costs are already covered by the current team, and where the biggest hidden spend is likely to appear.
Related skills
Generate and edit Draw.io, Mermaid, and Excalidraw diagrams from natural language using a structured JSON spec.
Join a video meeting as an AI bot with voice, avatar, and screenshare across four operating modes.
Fetch raw ad creative, app, ranking, and revenue data from AdMapix as structured JSON.
Stores durable facts in a categorized, plain-markdown vault on disk, alongside your agent's built-in memory.
Write, debug, and tune Playwright specs with locator strategy, trace diagnosis, and CI-aware timeouts.
More from stanestane
Browse all skillsAudit a game, feature, progression system, social system, live-ops loop, onboarding flow, monetization surface, or multiplayer space through the lens of the...
Define, refine, and evaluate the emotional identity, feeling, atmosphere, and vibe of a game, feature, event, region, or content theme. Use when shaping a ga...
Create a concise one-page game design document and export it as both markdown and PDF. Use when a user wants a one-page design doc, one-pager, pitchable desi...
Audit a game's FTUE (First Time User Experience) through the lens of the Hero's Journey / monomyth. Use when reviewing onboarding, tutorial flow, first-sessi...
Audit a video game pitch deck, publisher deck, funding deck, or investor-facing game presentation for clarity, structure, persuasiveness, visual readability,...
Audit a game, feature, live-ops system, progression loop, social feature, or monetization surface using a Self-Determination Theory-inspired motivation frame...