Before committing to a plan or launch, assume it already failed and reason backward through concrete causes — convert failure paths into mitigations, gates, and stop checks.

What it does

Before committing to a plan or launch, assume it already failed and reason backward through concrete causes — convert failure paths into mitigations, gates, and stop checks.

The skill document

Pre-Mortem Analysis

Core rule: Prospective hindsight beats "what could go wrong?" Assume the plan has already failed (past tense), generate concrete failure paths, reverse them into prevention requirements, and bind each top path to a verifiable plan change.

When to Use

  • Before kickoff, major technical commitment, high-risk sprint work, launch, or release.
  • After a plan looks solid but before execution, especially when optimism or overconfidence is likely.
  • When a decision is costly to reverse and risks are still implicit rather than enforced.

When NOT to Use

  • Work is small, local, and cheaply reversible — skip the ceremony.
  • You are mid-incident under time pressure — act now (OODA / scientific method); pre-mortem is pre-execution.
  • You would only emit generic risks ("scope creep", "requirements unclear") that do not bind to this plan.
  • Risks are already enforced by live gates (CI, canary, rollback, alerts) with no residual unlisted path.
  • A mature risk register already covers the same specific failure paths with owners and checks.

Procedure

  1. Set the failure frame in past tense: "It is [post-deadline date]. The plan failed: [rollback / data loss / no adoption / SLA breach]." Explaining a happened failure is required; predicting one is not enough.
  2. Generate failure reasons before filtering: sweep technical, process, assumptions, dependencies/external, and people. Force a second pass: "What did the plan most need to be true that was not?" Collect breadth first (aim for many distinct reasons); do not rank mid-sweep.
  3. Prioritize: group by theme; score likelihood × impact; keep the top 3–5 concrete risks (drop generics that do not bind).
  4. Failure-first reverse analysis (absorbed reverse path): for each top risk, (a) restate the failed outcome in past tense, (b) list necessary/enabling conditions that had to be true for that failure, (c) invert each condition into a verifiable prevention requirement (avoid/require rule + check), (d) bind owner, verification checkpoint, and ship/stage gate.
  5. Mitigate and update the plan: for each top risk, attach mitigation steps, spike/contingency if needed, and the reverse-analysis prevention requirements as explicit plan gates. A pre-mortem with no plan change is incomplete.
  6. Stop when top risks each have a bound mitigation or prevention gate, or when further reasons are only generic restatements — then ship the updated plan, do not keep brainstorming.

Output

  1. Failure scenario — past-tense disaster frame with date and failed outcome.
  2. Failure reasons — unfiltered list, then prioritized top 3–5 with likelihood × impact.
  3. Reverse paths — for each top risk: necessary conditions → inverted prevention requirements.
  4. Mitigations — owner, verification checkpoint, ship/stage gate per top risk.
  5. Plan deltas — concrete tasks, spikes, contingencies, and gates added to the plan.

Verification

  • Falsify/stop: if no plan-specific failure path can be stated in past tense with necessary conditions, stop — you are generating theater, not risk. If a "mitigation" has no verification checkpoint, it is not done.
  • Over-application guard: do not pre-mortem reversible chores, mid-incident firefighting, or systems that already enforce the same paths. Do not leave abstract risks as "mitigate later"; either invert them into gates or drop them as non-actionable.

Related skills

Activate when: user says 'do a pre-mortem', 'what could go wrong', 'why might this fail', 'invert the question', 'what would have to be true for this to be a...

4 installs2 stars

Before heavy deliberation, classify the decision as cheap or costly to undo; decide two-way doors fast and stage one-way doors to preserve options.

1 installs

When provisioning, setting a limit, or committing an estimate under uncertainty, size a buffer to residual error and the cost of breach—not to the optimistic edge.

1 installs

When a change has effects past the immediate fix—incentives, scale, feedback—trace consequence chains with timing and probability before committing.

2 installs

Under genuine uncertainty with no reliable forecast, inventory means, cap downside at affordable loss, act for commitments, and let goals emerge from controllable moves.

1 installs

Activate when: a file is submitted or in underwriting; rate lock is ticking; 'what could kill this loan before closing?'; thin-file or borderline borrower. D...