Schedule MRP production batches in Odoo (BaconCo) — the fluid shop-floor scheduler. Periodically read open `mrp.production.batch` records, rank them into a run order by the shop rule (manual pins first, then art readiness, then imminent event dates, then earliest governing deadline), write that order back to the floor, and refine it into machine + time slots where the picture is solid. Defers batches whose decals aren't printed or whose artwork isn't digitized below work that can actually run, and expedites them to the top once they're about to be late. Reads purchase orders + vendor tracking to know when goods will land, and uses receipt-readiness as guidance (jobs generally shouldn't start before their components are in) that it refines from human feedback. Handles rush orders dropped in mid-day by re-ranking. Talks to Odoo through the `drivethru_mcp` MCP server. Use whenever the user asks to schedule/plan production, rank or re-order the production queue, build a machine schedule, s

它能做什么

Schedule MRP production batches in Odoo (BaconCo) — the fluid shop-floor scheduler. Periodically read open `mrp.production.batch` records, rank them into a run order by the shop rule (manual pins first, then art readiness, then imminent event dates, then earliest governing deadline), write that order back to the floor, and refine it into machine + time slots where the picture is solid. Defers batches whose decals aren't printed or whose artwork isn't digitized below work that can actually run, and expedites them to the top once they're about to be late. Reads purchase orders + vendor tracking to know when goods will land, and uses receipt-readiness as guidance (jobs generally shouldn't start before their components are in) that it refines from human feedback. Handles rush orders dropped in mid-day by re-ranking. Talks to Odoo through the `drivethru_mcp` MCP server. Use whenever the user asks to schedule/plan production, rank or re-order the production queue, build a machine schedule, slot in a rush order, or check whether a batch's goods are in yet.

技能文档

Production scheduler (Odoo MRP batches)

You schedule the shop floor. Each open mrp.production.batch is a job, and your primary decision is what order the jobs run in:

  • sequence — the batch's run order, its rank in the queue

That ranking is the deliverable. It's what the floor works from, it's what the Production Batches list in Odoo is sorted by, and it stands on its own.

Machine and slot are a refinement you layer on where the picture is solid enough to justify one:

  • primary_workcenter_id — the machine
  • production_center_id — derived from the machine if you omit it
  • date_planned_start / date_planned_finished — the slot

Times computed from estimated durations and unconfirmed receipts are guesses, and a schedule that's wrong by twenty minutes teaches the floor to ignore it. Leaving a batch's slot empty is a fine outcome — leaving it unranked is not. Start/stop scheduling is being rolled in gradually; set the datetimes when a machine is genuinely free, the goods are genuinely in, and the duration looks real rather than Odoo's 3-minute floor.

You do this against a live, changing queue: rush orders drop in frequently, so treat every pass as a re-plan, not a one-shot.

This skill drives the Odoo drivethru_mcp MCP server. The transport is scripts/odoo_mcp.py:

python3 scripts/odoo_mcp.py tools                       # discover tools + schemas
python3 scripts/odoo_mcp.py call  '{"...":"..."}'  # call a tool
echo '{"...":"..."}' | python3 scripts/odoo_mcp.py call 

Every call prints one JSON object, or {"error": {...}} with a non-zero exit. ODOO_MCP_URL / ODOO_MCP_TOKEN must be set — if not, stop and tell the user. Run tools first and trust its inputSchema over any tool signature below.

The ranking rule

production_schedule_queue returns the queue already ranked. Three things combine to produce that order:

1. Manual pins outrank everything. A batch a manufacturing manager dragged in the list view carries manual_sequence = true and holds the place its stored sequence gives it. That's somebody's decision about their own floor. You rank around a pin — never over it, and never clear one unless a human asks you to.

2. Art readiness tiers what's left. Received goods aren't the only thing that decides whether a batch can run. A batch whose decals aren't printed or whose artwork isn't ready can't be started at all, so the queue sinks it below work that can — and then pulls it to the very top once waiting any longer would make it late.

Each entry tells you where it sits:

  • art_ready — false when something art-side is blocking it.
  • art_blockers — what, specifically: decals_no / decals_partial / decals_sample, and art_digitize / art_in_progress / art_hold_clc / art_not_started.
  • art_at_risk — true once it's due within art_release_days (default 3). These are ranked above everything, including runnable batches due sooner.
  • days_until_due — days to the earlier of its event and ship date.

A batch at the top with art_ready: false is not a job to schedule. It still can't run. It's there because the art has to be finished now or the job ships late. Say what's missing and who needs to move on it — don't put it on a machine.

The queue payload totals these as art_blocked_count and art_expedite_count. Pass art_release_days to widen or tighten the window (0 = only expedite once it's due today or already overdue).

3. Everything else follows the shop rule, filling the slots the pins left open:

  1. Imminent event dates (event_imminent) — an event_date that is already late, or within event_horizon_days (default 5), leads everything. A customer standing in a venue on a given day is the hardest deadline the shop has. Earliest first.
  2. The governing deadline — for everything else, the earlier of the event and ship dates. Earliest first.
  3. Event date breaks ties between equal deadlines.
  4. Whatever is ready — among equal dates, batches that are fully received (is_fully_received) go first, because they can run now.

A far-off event date does not jump the queue. Only a near one does. A tournament three months out has months of slack; the order shipping Friday does not. Outside the horizon an event date is just another deadline, and yields to a sooner ship date. days_until_event tells you where a batch sits; imminent_event_count totals the tier.

Never re-derive this ordering by hand — call production_schedule_queue and work its rank order. When a rush order lands, just call it again; the new batch appears at its correct rank.

Writing the run order back

A ranking that lives only in your reply isn't a schedule. Push it into Odoo with production_set_run_order, passing the batch ids in run order:

python3 scripts/odoo_mcp.py call production_set_run_order \
  '{"batch_ids": [88, 92, 71], "activity_message": "Re-ranked after rush 41207"}'
  • matches_stored_run_order on the queue payload tells you whether the write is needed at all. When it's true, don't write.
  • Pinned batches come back under skipped rather than renumbered, so what you get back is the order the floor will actually see. Read it, and say so if a pin is holding a job ahead of something urgent.
  • override_manual: true releases the pins. Only when a human has explicitly asked for that.
  • For a one-off nudge, production_schedule_batch also takes sequence and manual_sequence.

Receipt readiness: a rule of thumb, not a wall

As a general starting point, a job usually shouldn't start before its components are received — starting early strands it on the floor. But the tools do not enforce this. You can schedule a start on a not-yet-received batch whenever it makes sense; the readiness signals are there for you to reason with, not to block you.

  • Check is_fully_received and expected_ready_date (from the supply picture — see below) before you commit a start.
  • When a batch isn't in yet, prefer to schedule its start on or after expected_ready_date — unless there's reason to slot it earlier.
  • This is guidance you refine from feedback. When a human corrects a call ("go ahead and set batch 88 for 8am, the blanks land first thing" / "never start the embroidery batches before the thread's in"), remember it — those learned preferences, not a hard-coded rule, are what should shape future decisions.

Which machine can run a job

The tools pre-filter eligible machines for you. On production_get_batch, use eligible_workcenters (each includes its current scheduled_batches load, so you can find a real gap) and eligible_production_centers. The rules behind the filter — decoration-method match, allow_production_batch, minimum_piece_count, capacity (units_per_hour, min/max_mo_quantity) — are in references/scheduling_algorithm.md.

Knowing when goods will arrive

production_batch_supply (or the supply block on production_get_batch) is the "when can this start?" answer for one batch:

  • purchase_orders — the POs feeding it (status_from_vendor, date_planned, per-line qty_received).
  • receipts — the incoming transfers, each with scheduled_date, vendor_tracking (carrier, tracking number, status, delivery_date), and an expected_arrival.
  • Readiness rollup: is_fully_received, receipt_status, expected_ready_date (the latest arrival across open receipts = when the whole batch is on hand), has_unknown_eta, blocked_on_receipt.

When goods are late or the ETA is unknown (has_unknown_eta), surface it — that batch can't be started and may need purchasing/vendor follow-up.

Reading any field you need

The curated payloads cover scheduling. For anything else on mrp.production.batch, purchase.order, stock.picking, decoration, mrp.production, vendor.tracking, etc., use the generic read-only tools: mfg_list_modelsmfg_fields {"model": ...}mfg_read {"model": ..., "ids"|"domain": ..., "fields": ...}.

Tool cheat-sheet (verify with tools)

PurposeTool
Ranked worklist (start here each pass)production_schedule_queue
Write the run order back to the floorproduction_set_run_order
Full planning snapshot (batches + machine load + reference data)production_overview
One batch: decorations, eligible machines, MOs, supplyproduction_get_batch
One batch: supply/receipt/tracking only ("can it start yet?")production_batch_supply
Write one schedule decisionproduction_schedule_batch
Write many at once (atomic by default)production_bulk_schedule
Run Odoo's native slot allocatorproduction_plan_batch
Machines + their scheduled loadproduction_list_workcenters / production_get_workcenter
Reference dataproduction_list_production_centers, production_list_decoration_methods
Read any field on any mfg modelmfg_list_models, mfg_fields, mfg_read

A scheduling pass, end to end

Steps 1–3 are the pass. Steps 4–6 are the refinement, and they're optional per batch.

  1. Rank. production_schedule_queue (add {"include_eta": true} to see expected-ready dates for the not-yet-received batches; {"unscheduled_only": true} for just the backlog).
  2. Publish the run order. If matches_stored_run_order is false, call production_set_run_order with the ids in rank order. Now the floor's list matches your plan — that alone is a complete, useful pass.
  3. Call out the art. Anything with art_at_risk is at the top and can't run: report it as work for the art department, naming the batch and its art_blockers, before you talk about machines. This is usually the most useful thing in the whole pass — it's the part somebody can still fix. Nothing art-blocked gets a machine or a slot.
  4. Inspect the batches you'll also slot: production_get_batch for eligible machines + their load and the supply block, or production_batch_supply when you only need readiness.
  5. Place the ones you can time with confidence onto an eligible machine in a real gap, honoring the run order. Use production_bulk_schedule for a whole day (atomic: true rolls back the batch of writes on any error). Skip the rest — their rank already says what runs next.
  6. Unreceived batches: by default, schedule the start on/after expected_ready_date, or leave the slot empty and flag the blocker — but this is a judgment call, not a wall, and prior human feedback may say otherwise for this shop/decoration type.
  7. Rush order? Re-run step 1 and reflow — don't hand-insert.

Working inside an Odoo Discuss conversation

You may be answering a person in an Odoo Discuss DM (your replies post back into their thread):

  • Be concise and conversational — summarize the plan (anything art-blocked and out of slack first, then the run order, then batch → machine → slot for the ones you timed), don't dump raw JSON. Surface a tool error's human-readable message.
  • Confirm before writes. Scheduling changes live Odoo data. State exactly what you'll place where, then call the write tool. Never invent ids — look them up first.
  • Reach for docs_get {"slug": "production_scheduling"} (an Odoo operator doc) for the shop's authoritative rules.

Errors

  • config_error (exit 2) — ODOO_MCP_URL / ODOO_MCP_TOKEN missing.
  • invalid_arguments (exit 2) — bad CLI usage or non-JSON arguments.
  • connection_error — Odoo unreachable, transport error, or key rejected.
  • A tool that ran but failed returns a normal MCP result with isError: true and a human-readable message — surface it.

References

  • references/scheduling_algorithm.md — the ranking, machine-eligibility, and reflow algorithm in detail (with pseudocode).
  • references/receipt_readiness.md — reading the supply/tracking picture and the expected-arrival reasoning behind the "usually don't start before received" guideline.

相关技能

Enter and manipulate BaconCo sales orders in Odoo the way a rep does — through the `drivethru_mcp` MCP server's sales-entry tools. BaconCo is a custom-appare...

1 次安装

Internal operations agent for the purchasing→manufacturing→shipping side of the Odoo ERP, over the `drivethru_mcp` MCP server. Use whenever the user asks about purchase orders, RFQs, vendors, receipts, inbound/outbound shipments, deliveries, carriers & tracking, inventory moves/pickings, replenishment/reordering, product stock levels, or manufacturing (production batches, MOs, work orders, BOMs, production centers) — to query and analyze them, or to run the vendor replenishment→purchasing loop. Query any field on purchase.order(.line), vendor.tracking, stock.picking, stock.move(.line), delivery.carrier, stock.warehouse.orderpoint, product.product, product.template, mrp.production.batch, mrp.production, mrp.workorder, mrp.bom, mrp.bom.line, and production.center; aggregate and analyze the results; and drive the replenishment→PO→confirm write flow. This is the agent that backs Drive Thru "routines" (scheduled operations sweeps). Especially when answering a person inside an Odoo Discuss c

Talk to an Odoo ERP through its `drivethru_mcp` MCP server — discover the available Odoo tools at runtime and call them to look up eBay products/inventory, push eBay orders and read tracking, run the Accounts Payable PO→vendor-bill flow, review documents in the Documents app against their purchase orders and fix incorrect PO line pricing (the "check the Purchasing folder against the POs" / vendor-invoice pricing-review workflow, filing each document into Matched or Questions), schedule MRP production batches, drive vendor replenishment purchasing (run the replenishment report → curate lines → add to a PO → hand style/color/size/qty to the vendor's purchasing skill → write pricing + confirmation back and confirm the PO), and retrieve internal SOPs / best practices / policies from the Knowledge base scoped to the asking person's permissions. Use whenever the user needs to read from or write to Odoo, especially when you are answering a person inside an Odoo Discuss conversation.

6 次安装

Graphic-artist tasks for Bacon & Co decorations — (1) generate product mockups by compositing a decoration (logo/graphic) onto a blank product photo (deterministic; no model-generated pixels; self-reviewed), (2) make a DTF decoration "production-ready" / "drop the art" — take the real thumbnail, size it to the decoration location, render at 300 DPI, upload the DTF production file, set size + colors, and create a print sample, driving the decoration toward the 'done' state via the drivethru_mcp decoration_* tools, and (3) clean up degraded / AI-generated flat art before production — deterministically snap it back to its true inks, rebuild faded/broken/jagged outlines, and re-render crisp at print size (fixes the "looks fine as a thumbnail, falls apart at 13 inches" problem). Use whenever the user wants to see a logo on a garment, place artwork on a blank, remove an image background (knock a solid color out of flat art, or segment a photographic subject), tune a print's size/position, cl

Payable matching for BaconCo — reconcile vendor documents in Odoo's Documents app against their purchase orders and correct incorrect PO line pricing. Use for requests like "check the Purchasing folder against the POs and fix the pricing", "match the vendor invoice / order confirmation / acknowledgement to its PO", "AP price matching / invoice-to-PO matching / three-way match", "reconcile the vendor documents and mark the POs checked", or "go through the Purchasing folder". The flow: read every document in a Documents-app folder (extracting text out-of-context so large batches don't bloat the context window — falling back to a page render + OCR/vision for scanned or custom-encoded PDFs that won't extract as text), pull the PO number / line items / unit prices from each, compare to the purchase order line by line, correct any wrong `price_unit`, post a "checked" log note on the PO (internal, never a "Send message"), and FILE every document into the `Matched` or `Questions` subfolder — e

让定时任务在每次运行时自动采用最新的提示词、策略、投递方式和模型配置。

21 次安装